Skip to content

HVAC & Refrigeration · 38 checkpoints

HVAC Commissioning Checklist

A commissioning checklist for new HVAC installations covering pre-commissioning review, mechanical/electrical/controls start-up, functional performance testing, operational checks, and handover documentation.

38 of 38 items on the sheet

Tick items off as you go, hide a section or a single line, write a note or add a photo on any row, then save it. Nothing you type, tick or attach here is saved or sent anywhere: a note and a photo print on the sheet and are gone when you reload.

The button opens your print dialog: choose Save as PDF as the destination (or print it straight to paper). The sheet carries only the items you kept.

Sheet details

Optional. Whatever you type prints across the top of the sheet; leave one blank and it prints as an empty line to fill in on site.

Pre-Commissioning 6/6

System Start-Up — Mechanical Systems 5/5

System Start-Up — Electrical Systems 5/5

System Start-Up — Control Systems 5/5

Functional Performance Testing 8/8

Operational Requirements Checks 5/5

Final Documentation and Handover 4/4

Notes

Optional. Anything you write here prints at the foot of the sheet, after the last section: one place for whatever does not belong to a single line.

0 of 3,000 characters

That is the whole sheet.

The button opens your print dialog: choose Save as PDF as the destination (or print it straight to paper). The sheet carries only the items you kept.

This checklist is a working document, not a code inspection or a substitute for a licensed professional. Confirm the current code, permit and licensing requirements for your own jurisdiction before you sign anything off.

What the HVAC Commissioning Checklist Covers

38 checks across 7 sections: Pre-Commissioning, System Start-Up — Mechanical Systems, System Start-Up — Electrical Systems, System Start-Up — Control Systems, Functional Performance Testing, Operational Requirements Checks, Final Documentation and Handover. Work through it on a phone on site, or export the PDF and carry the paper. Anything you tick prints ticked, a note you write on a line prints under it, and a section you do not need can be hidden before you export.

It is free, there is no account, and nothing you enter is kept. Use it as a starting checklist, not a standard. It is written for general HVAC & Refrigeration work, so add the checks your own standards and your local code require before you take it to a job.

Where Zeus comes in

The checklist is the easy half. The paperwork after it is not.

Print this one as often as you like. When the filing starts to cost more than the inspection, Zeus keeps the job, the address, the photos and the finished report in one place on your phone. It all works with no signal in a basement.

Start free, no card

Free plan, no card. Inspections, quoting and invoicing are all free; Pro adds job photos and documents.