Gutters · 27 checkpoints
Gutter Installation Checklist
A seamless or sectional gutter install from the measure-up to the handover: fascia condition, run lengths and outlet positions, slope, hangers, seams, downspouts, the water test and the record the Client keeps.
27 of 27 items on the sheet
Tick items off as you go, hide a section or a single line, write a note or add a photo on any row, then save it. Nothing you type, tick or attach here is saved or sent anywhere: a note and a photo print on the sheet and are gone when you reload.
The button opens your print dialog: choose Save as PDF as the destination (or print it straight to paper). The sheet carries only the items you kept.
Sheet details
Optional. Whatever you type prints across the top of the sheet; leave one blank and it prints as an empty line to fill in on site.
Measure-Up 6/6
A downspout that empties against the foundation moves the problem rather than solving it. Look at where each outlet will discharge before the position is fixed.
Layout and Slope 3/3
Many installers work to roughly 1/4 inch of fall per 10 feet of run, and the gutter maker's instructions may give a different figure. Long runs are often split with a high point in the middle and an outlet at each end.
Forming and Hanging 7/7
Closer spacing is common where snow and ice load the gutter. Write the spacing used on the job record.
Downspouts 3/3
Water running down the inside of the pipe then passes over each joint instead of out through it.
Water Test 3/3
Handing Over 5/5
Notes
Optional. Anything you write here prints at the foot of the sheet, after the last section: one place for whatever does not belong to a single line.
0 of 3,000 characters
That is the whole sheet.
The button opens your print dialog: choose Save as PDF as the destination (or print it straight to paper). The sheet carries only the items you kept.
This checklist is a working document, not a code inspection or a substitute for a licensed professional. Confirm the current code, permit and licensing requirements for your own jurisdiction before you sign anything off.
What the Gutter Installation Checklist Covers
27 checks across 6 sections: Measure-Up, Layout and Slope, Forming and Hanging, Downspouts, Water Test, Handing Over. Work through it on a phone on site, or export the PDF and carry the paper. Anything you tick prints ticked, a note you write on a line prints under it, and a section you do not need can be hidden before you export.
It is free, there is no account, and nothing you enter is kept. Use it as a starting checklist, not a standard. It is written for general Gutters work, so add the checks your own standards and your local code require before you take it to a job.
More Gutters Checklists
Built for Gutter work: see the Gutter job app.
Where Zeus comes in
The checklist is the easy half. Keeping it on hand every time is not.
Print this one as often as you like. Zeus keeps your own checklist on your phone instead, ready before the next job rather than back in a drawer, with a PDF out whenever you need one.
Free plan, no card. Your own checklists and PDF exports are on the free plan.